-
Operational Guide for Forest Road Wetland Crossings
The purpose of this guide is to provide forestry professionals and contractors with a general understanding of boreal wetlands, what to expect in terms of water movement between... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Northwest Transmission Line EAO Inspection Records
Environmental Assessment Office inspection records for the Northwest Transmission Line project. The Environmental Assessment Office (Chris PARKS, Compliance Officer) completed... -
Natural Resource Sector Major Projects
Link to access/download dataset from the BC Data Catalogue -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water...
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related... -
Ministry of Transportation (MOT) Culverts
A Culvert is a pipe (less than 3m in diameter) or half-round flume used to transport or drain water under or away from the road and/or right of way. Culverts that are greater... -
Mid-Bulkley Watershed Restoration Project: Level 1 Assessment Roads,...
This report is the initial survey of the impacted areas within the Mid-Bulkley Watershed and denotes the nature of the impact from past timber harvesting and road building... -
Marine Environmental Effects Monitoring Program: Design and Evaluation for...
This report provides a review of the Environmental Effects Monitoring Program (EEMP) at ten BC coastal pulp mills and evaluates the ability of current and past EEMPs at these... -
Manuscript Report Series No. 990: Physical and Chemical Oceanographic Data
Oceanographic surveys were conducted from 1957 to 1967 in a number of the inlets along the west coast of Vancouver Island, and on the north coast of British Columbia, in order... -
Letter from Canadian Environmental Assessment Agency Fisheries for the...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Khyex-Tyee: Foreshore Habitat Re-construction Works
This report documents the foreshore habitat compensation works constructed by the Ministry of Transportation and Highways as part of the Highway 16 reconstruction project,... -
Juvenile Salmonid Habitat Utilization in the Skeena River Estuary
This report examines the salmon habitat utilization of five species of Pacific salmon in the greater Skeena River estuary. In particular, interest is given in salmon habitat... -
Juvenile Salmon Usage of the Skeena River Estuary
This paper examines the geographic and temporal habitat utilization of juvenile anadromous salmon in the greater Skeena estuary in relation to the footprints of the proposed... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia:...
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using... -
Highway #16 Fish Passage Assessment in Middle Skeena Watershed
The purpose of this report is to present results and background information for the Middle Skeena Watershed fish passage assessment along Highway #16. In July 2004 the Skeena... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Forest Tenure Road Section Lines
This is a spatial layer that reflects operational activities for road sections contained within a road permit. The Forest Tenures Section (FTS) is responsible for the creation... -
Forest Tenure Cutblock Polygons
This is a spatial layer that reflects operational activities for cutblocks contained within harvesting authorities. The Forest Tenures Section (FTS) is responsible for the... -
Follow-up Audit on the Transportation of Dangerous Goods
This audit focused on the extent to which Transport Canada and the Canada Energy Regulator implemented recommendations from our 2011 and 2015 reports regarding these... -
Fairview Terminal Phase II Expansion Project Comprehensive Study Report
The Prince Rupert Port Authority (PRPA) and Canadian National Railway Company (CN) are proposing the construction and operation of a wharf extension and expanded container and...