-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to...