Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Wild Salmon Policy Indicator Analysis for the Kispiox TSA
Wild Salmon Policy indicators including road density, stream crossing density, riparian disturbance, and anthropogenic total land cover alternation (TLCA) were calculated for... -
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Assessment
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Technical and Management Proposal: Impact of Coal Dust on Marine Environment...
The report contains a concise summary report outlining the findings of this study on the potential impact of coal and coal contaminated sediments on marine life. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Ridley Island Port Construction Activities - 1982: Background and...
This report contains the findings of an EPS program carried out in the summer of 1982 to monitor the effects on the receiving environment of port construction activities... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous... -
Landsat 8 Satellite Images from 2013-2017
Landsat 7 Satellite Images from 2013 - 2017. Data is provided by WRS path and row number. Data files follow the new USGS Landsat categories and are classified as Collection 1... -
Landsat 8 Composite Tiled Image (Years 2013 to 2017)
A composite image of the Skeena Watershed and surrounding area using Landsat 8 data from 2013 - 2017. The composite image is tiled into four images - NW, NE, SW, and SE. The... -
Landsat 8 Composite Image of Skeena Watershed (2013-2017)
Landsat 8 Composite Image Cut to the Skeena Watershed Boundary. Capture dates 2013 to 2017. Projection is EPSG 3005. -
Landsat 7 Composite Tiled Image (Years 2000 to 2002)
A Landsat 7 composite image of the Skeena Watershed and surrounding area years 2000 - 2002. The composite image is tiled into four images - NW, NE, SW, and SE. The image is...