-
Report on the Preliminary Survey of Steelhead of Skeena River Drainage Systems
This report represents an effort to compile as much information as possible on the distribution, migration, and life history of steelhead in the Skeena system. Reference was... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Fish Passage Culvert Inspections
This project was implemented to assess fish passage at culvert-bearing stream crossings. These assessments were carried out at culvert crossings installed on fish-bearing... -
Survey of Kispiox River Steelhead Anglers During the Classified Waters Period of 1997
Recreational angler's demographics, angling characteristics, angling methods and steelhead (Oncorhynchus mykiss) catch rates were examined with an on-site roving survey of... -
Compilation of Stock Assessment Information for Skeena River Steelhead:...
Geographic information from the BC Watershed Atlas and juvenile steelhead surveys from the Sustut, Kispiox, Bulkley, and Upper Skeena rivers were used to update a model of... -
Deep Creek Side Channel and Bank Stabilization
The Deep Creek side channel and bank stabilization project is intended as a demonstration project to create off-channel rearing and overwintering habitats for salmonids... -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table (related to the Lakelse Lake... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the... -
Assessment of Steelhead Enhancement Opportunities in the Morice River System
Juvenile salmonid populations in two tributary streams to the Morice River system, Owen and Lamprey Creeks, were assessed by the Fish Habitat Improvement Section in the fall of... -
BWMT Project Reports
This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013. -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed,... -
Skeena River Steelhead Stock- Assessment Program: 1994 Catch and Escapement...
During 1994, a large scale stock-assessment program was implemented to determine the status of steelhead and coho populations in the Skeena River. Catches in commercial... -
Skeena River Steelhead Stock Assessment Program: Estimation of the 1994...
The 1994 steelhead catches in the commercial fishery of Area 4 were estimated by reference to the steelhead:sockeye ratio from observer records, and adjusted hail reports. The... -
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of... -
Assessment of Wild Steelhead Abundance Trends in British Columbia...
Intra-regional similarities and inter-regional differences in wild steelhead (Oncorhynchus mykiss) abundance patterns over time throughout British Columbia were identified using...