Zymoetz (Copper) River Watershed Restoration Program: 16-Km Side Channel (Site 54B)
This dataset focuses on the restoration works conducted at Site 54B, one of the many restoration works conducted along the the Zymoetz (Copper) Rivers in the late 1990s/early... -
Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Fish Use Monitoring and Evaluation of Three Constructed Ponds within the...
This dataset contains a report evaluation the status of three constructed ponds in the Kalum Forest District. The ponds were constructed at Copper River 3 Km Off-channel Site,... -
Copper River Watershed Restoration Program: Debris Catcher Construction
Goals of the project included the improvement of fish habitat and educational purposes such as showing debris catchers as alternatives to traditional riprap bank protection for... -
Copper River Watershed Restoration Program: Site 9 Berm Removal & 3km Side Channel
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This... -
Zymoetz (Copper) River Culvert Replacement and Outlet Channel (Site 77)
This project encompassed a culvert replacement to improve fish passage. Overwintering habitat by juvenile coho was isolated from the river by two perched culverts in the road.... -
Routine Effectiveness Evaluation - Off-channel ponds and debris structure...
This datasets contains information about restoration and construction works conducted at three sites along the Copper (Zymoetz) River. For more information on the sites, visit... -
Interim Resource Plans for Copper Lower, Clore, Kitnayakwa
This dataset contains the interim resource plans for multiple sub-watersheds.