Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bulkley River and Morice River Watershed Groups Fish Passage Restoration Planning
In April of 2020, the Society for Ecosystem Restoration Northern British Columbia (SERNbc) undertook an initiative to plan and conduct fish passage restoration planning... -
Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish... -
Mid Skeena Watershed Restoration Effectiveness Monitoring
In 2006, Gitksan Watershed Authorities was retained by the Pacific Salmon Commission to conduct an effectiveness monitoring in three Mid Skeena sub-basins: the Kispiox,... -
2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon,... -
Fish Passage GIS Analysis Version 2 Methodology and Output Data...
The BC Land Based Investment (LBI) fish passage program is focused on remediating stream crossings that impede freshwater fish migration. The most common barrier to fish is... -
Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream... -
Results of the Stream Crossing Quality Index (SCQI) Survey for the Upper...
This report present the results of the Stream Crossing Quality Index (SCQI) survey conducted in the Upper Babine River Corridor during the week of July 4th, 2006. -
Provincial Stream Crossing Information System (PSCIS) Remediation Sites
Points where a barrier to fish passage has been rectified or remediated. This is the third phase in the process and can only follow after (1) an assessment has been performed on... -
Provincial Stream Crossing Information System (PSCIS) Habitat Confirmation Sites
Points where an evaluation of the fish habitat up and downstream of a road crossing have been carried out. Phase 2 of 4 in the Fish Passage Workflow, Habitat Confirmations are... -
Provincial Obstacles to Fish Passage
The Provincial Obstacles to Fish Passage theme presents records of all known obstacles to fish passage from several fisheries datasets including the Fisheries Information... -
Provincial Stream Crossing Information System (PSCIS) Design Proposal Sites
Points where a fish passage assessment has been performed on a stream crossing structure and found to be a failure. Design points have been identified as a priority for... -
Ministry of Transportation (MOT) Culverts
A Culvert is a pipe (less than 3m in diameter) or half-round flume used to transport or drain water under or away from the road and/or right of way. Culverts that are greater... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia:...
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Unit 1996
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management...