BWMT Project Reports
This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013. -
Warning Signals of Adverse Interactions between Climate Change and Native...
We examine the direct effects of multiple disturbance agents on individual tree development and stand productivity in 15–40-year-old managed forests in British Columbia, Canada.... -
Biophysical, Socio-Economic, and Regional Data and Information (BERDI)
BERDI – a data bank for Biophysical, (Socio)Economic, and Regional Data and Information (pronounced “birdie”) - was created to make data collected by the Canada Energy Regulator... -
Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Wetlands Action Plan for BC
The Wetland Stewardship Partnership (WSP) is a group of organizations and government agencies committed to wetland conservation in BC. In this document, the WSP proposes a... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors... -
Shovel Lake Wildfire Ecosystem Restoration Plan
This collaborative and holistic Ecosystem Restoration Plan for the 2018 Shovel Lake Wildfire attempts to consider all values and address ecological integrity and resilience in... -
Rare Ecosystems of the Babine River Watershed
Our objective was to identify rare ecosystems in the watershed using existing data such as field reports, terrestrial ecosystem mapping projects, and predictive ecosystem... -
Pacific Trail Pipelines Project: Application to Amend Environmental...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Pacific North Coast Integrated Management Area Plan
The Pacific North Coast Integrated Management Area ( PNCIMA ) is one of five national Large Ocean Management Areas identified in Canada’s 2005 Oceans Action Plan. The plan... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Operational Guide for Forest Road Wetland Crossings
The purpose of this guide is to provide forestry professionals and contractors with a general understanding of boreal wetlands, what to expect in terms of water movement between... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Northwest Transmission Line Project: Assessment Report
This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies... -
Nadina Mountain Park Management Plan
The Nadina Mountain Park management plan establishes long-term strategic direction for Nadina Mountain Park. It sets out a vision for the future state of the park; addresses...